Intel SK Hynix Talks Revive U.S. Memory Plans
Intel SK Hynix talks about U.S. memory manufacturing at Intel's Ohio campus could validate Intel's $100 billion foundry plan and lift investor flows.

KEY TAKEAWAYS
- Reports said SK Hynix was in talks to produce memory chips at Intel's Ohio campus.
- A tie-up could validate Intel's foundry push and improve utilization of Ohio's planned capacity.
- South Korean review rules for advanced memory technologies may complicate overseas front-end production moves.
HIGH POTENTIAL TRADES SENT DIRECTLY TO YOUR INBOX
Add your email to receive our free daily newsletter. No spam, unsubscribe anytime.
On Sept. 16, 2026, SK Hynix said it is exploring options after reports emerged of talks with Intel Corp. about producing memory chips at Intel’s Ohio campus. The discussions could help Intel boost utilization of its underused U.S. manufacturing facilities.
Talks and Official Responses
A report cited three people familiar with the discussions, saying SK Hynix is in talks with Intel about making memory chips in the U.S. for the first time. Scenarios include SK Hynix leasing part of Intel’s Ohio manufacturing campus or forming a joint venture with Intel and major cloud-computing customers. The talks are described as preliminary and exploratory, with multiple structural options under review.
SK Hynix issued a statement saying it is exploring various options to strengthen its competitiveness but that no specific plans or arrangements have been finalized. Intel declined detailed comment, calling the report speculative while reaffirming its ongoing investment and site preparation at the Ohio campus.
Ohio Campus and Regulatory Context
Intel pledged up to $100 billion for its multiyear Ohio manufacturing campus, which has faced delays. Two planned plants are now expected to be completed around 2030–2031, well behind the original 2025 target. The scale and delay have made attracting external customers critical to the economics of Intel’s third-party manufacturing push.
Potential deal structures under discussion include SK Hynix leasing part of the Ohio facility or forming a joint venture with Intel and cloud companies. The product mix for any Ohio production—high-bandwidth memory (HBM), DRAM, or NAND—has not been determined.
SK Hynix is already investing about $4 billion in an advanced-packaging HBM plant in West Lafayette, Indiana. That facility imports wafers and packages them into memory products, representing back-end operations. Any Ohio arrangement would mark SK Hynix’s first front-end wafer fabrication in the U.S., a significant expansion beyond its Indiana packaging work.
Advanced memory technologies like HBM can be designated as “national core technology” under South Korea’s Industrial Technology Protection Act. Such designation requires regulatory review before overseas manufacturing or technology transfer, with final decisions resting with SK Hynix. Meanwhile, U.S. industrial policy and CHIPS Act incentives encourage new production in American facilities, aligning a U.S. front-end memory presence with broader supply-chain goals.
Attracting external volume such as SK Hynix would help validate Intel’s foundry strategy at Ohio and improve utilization of its committed capacity, a key element in Intel’s broader turnaround narrative. However, any move would require regulatory clearances, structural decisions, and a multiyear build-out before commercial production begins.





